Apex Heat App updates

Changes made to Apex Heat App, by date: new features, improvements, calculation changes and fixes. Calculation changes are marked separately because they can change the results of properties you have already calculated.

  1. New

    LED relighting can now be calculated by lighting zone

    Give each zone its current lighting and its new LED lighting. The results and the report show each zone's saving, cost and payback time. The saving is net of the added heating, since LED lights warm the rooms less.

  2. Calculation change

    The ground-source drilling cost now includes the trench to the building

    The drilling price now includes the trench from the boreholes to the building and the collector wells. The trench shows on the drilling map and in the report, and the drilling, trench and collector well prices can be entered from a contractor's quote. In most buildings the investment changes little, since digging was already priced per borehole before, and it rises most where the boreholes stand far from the building.

  3. Improved

    The drilling area can now be edited on the map

    Drag the drilling area's corners on the map, or click a neighbouring parcel to open it for boreholes. When a field lands on such ground, the map and the report remind you to check underground services and wells. Neighbouring buildings are now left out of the rig's area, which can change drilling results.

  4. New

    EV charging can now be calculated for housing companies

    Choose charging readiness, turnkey charging or converting the heating posts, and enter the building's parking spaces. The results and the report show the investment, the yearly fees, what charging adds to the housing company's electricity bill, and whether today's grid connection is enough and what enlarging it costs, with and without load management. The car users pay for the charging energy, so it does not show in the housing company's consumption, emissions or energy class.

  5. New

    Three measures that cut the district heating power charge are now calculated

    The contract power review shows the saving from lowering the contract power to the peak the buildings need, and costs nothing. Peak shaving calculates how much a storage tank cuts the peak and can add a demand response credit to the saving; return water cooling saves where the tariff is based on water flow. Heat consumption does not change, only the power charge.

  6. Fixed

    The energy subsidy is calculated without air tightness and SFP measurements

    Varke confirmed in writing that the subsidy's E-numbers must not mix table values with measured ones. The subsidy's threshold and the improvement over the current state now use the E-number without its air tightness and SFP measurements, so a building where only the measurements are recommended gets none. The E-number in the results, the certificate and the reports still credits the measurements.

  7. New

    Air-to-air heat pumps are now calculated as an investment option

    For a building without a heat pump, air-to-air heat pumps can be calculated with a chosen model and number of units, alone or with an exhaust air heat pump. They heat beside the existing system, which still makes the hot water and the rest of the space heat, and in the energy subsidy they take the 40% heat pump row. The options are off by default, so saved projects' results do not change until they are switched on.

  8. Calculation change

    Borehole fields are sized with the brine temperature model instead of a yield-per-metre table

    A field's yield per metre is calculated from the field's number of holes and depth and from the area's climate, unless you enter the yield yourself. The brine temperature is also calculated month by month from the climate instead of a fixed 3 °C, so the ground source sCOP changes.

  9. Improved

    Boreholes can be placed on the street and park land beside the lot

    Two new options add land beside the lot to the drillable area, with the city's permission: either the street halfway to the opposite lot plus a narrow strip of the adjacent park, or the whole adjacent park near the lot. With the first, drill starts stay on the lot and the holes are drilled at an angle, and a large lot that already fits enough boreholes gets no street or park land added.

  10. New

    A heat pump model can be chosen from a list of manufacturers' real models

    A sizing-table row can take a ground-source or air-to-water model, and a number of units of it, from a catalogue fitted to manufacturers' published data: 145 ground-source and 67 air-to-water pumps. The calculation uses the chosen model's COP, operating limit and cold-weather output, so the row's sCOP and coverage are the model's. When the building's existing heat pump is chosen from the catalogue, today's heating and the baseline for savings run on that model.

  11. Other updates

    • Improved: The solar array's size can be entered in kilowatt-peak
    • Improved: The energy subsidy can be calculated for investments you choose
    • Calculation change: The boreholes' distance from a neighbour's plot grows with their depth
    • Calculation change: Window and door renewals default to U-value 0.70 W/(m²K), so they count towards the energy subsidy
    • Calculation change: Heat pump COP curves were fitted to manufacturers' measurements
    • Calculation change: Current electricity cost rises where a building has a heat recovery machine
  12. Improved

    Results are now also shown building by building

    A building switcher shows each building's own figures, and heat recovery calculated per ventilation unit is shown unit by unit. Heating systems, heat recovery, solar and envelope measures can be calculated for the whole property or building by building, and the guidance says when the per-building choice makes sense.

  13. New

    Shared workspaces are available to every user

    In a shared workspace colleagues see and edit the same projects, while a personal workspace's projects are seen only by the person who made them. Anyone can create a new shared workspace from the menu, invite colleagues to it and switch between workspaces.

  14. Calculation change

    Installation work is priced dearer in the capital region

    The installation and site work cost factor is set by the municipality's region. In Helsinki, Espoo, Vantaa and Kauniainen it rose by 8%, so installation work there costs more than before.

  15. Improved

    The results show the property's energy flow as a diagram

    The diagram runs from current consumption to consumption after the recommended investments: space heating demand, circulation losses, free energy, heat pump electricity, energy efficiency savings and the solar share. Its left side is the current state, and only the two right-hand sums describe the state after the investments; with no investments, the diagram shows the current state alone.

  16. Calculation change

    The consumption year normalises heat consumption for weather

    When the consumption year is given, the space heating share is corrected by the ratio of heating degree days between the measured year and the calculation's reference weather while hot water stays as it is, so consumption measured in a mild year no longer understates a typical year's heat demand. Stored hourly series are normalised from their own year, and the factor shows in the results and the report. Without a year the results do not change, and a heat pump property's consumption is not normalised.

  17. Other updates

    • Improved: Design costs can be added to the energy subsidy, by default 3% of the recommended investment
    • Improved: A system is chosen and costed in one section
    • Improved: The IFC and energy performance certificate uploads are no longer in beta
    • Improved: Energy reports for renovation projects can be made
    • Calculation change: An air-to-water heat pump's electric backup boiler is sized only for the peak the pump leaves
    • Calculation change: Oil and gas heated properties are recommended a pure heat pump over a fuel hybrid
  18. Calculation change

    Heat pump capacity fell, now that it is sized for a target share of the year's heat energy

    The capacity is now the smallest that covers a set share of the year's heat energy, rather than a fixed share of peak power. In the calculation's default example the ground source capacity fell from 143 kW to 120 kW, and to 73 kW with heat recovery, where the sizing covers the remaining demand. In close cases the recommendation can change. Detached houses are still sized for full peak power, and a coverage share of your own can still be entered.

  19. New

    Apex Heat can be used from an AI assistant through the MCP connector

    Claude, ChatGPT or another assistant that supports MCP can open Pro projects, read calculation results, import consumption, energy performance certificate and IFC files, and make reports. Every change that saves is confirmed first. The connector is in beta and is switched on account by account, and apexheat.io/connect shows how to add it.

  20. Other updates

    • Improved: A field that blocks the calculation can be reset to its estimate with one click
    • Improved: District heating energy price, demand charges and emission factor can be entered
    • Improved: A property buying district heat through a neighbour can calculate its own connection
    • Improved: Consumption files can also be imported at monthly resolution
    • Calculation change: Walls shared by adjacent buildings are deducted from the exterior wall area
    • Calculation change: Switching to district heating now includes the cost of waterborne heat distribution
    • Fixed: Address search no longer picks a building from the wrong municipality by mistake